Production / Post Production
TBN 10 Channel Master Control
TBN programming is originated at the network’s master control facility and headquarters in Tustin, CA. The network wanted to build and broadcast from an all new digital master control facility that includes nine standard definition channels (SD) and one high definition (HD) channel. The new system consolidates TBN’s network into one central facility.
HP Pavilion
The HP Pavilion is home to the NHL's San Jose Sharks, Stanford Cardinal Basketball and a variety of top drawing concerts and public events.
Benny Hinn Ministries
Ministries to design and engineer an HD installation at the ministries' Aliso Viejo, Calif., production studios. The new HD studio will provide Benny Hinn Ministries with permanent studio facilities and enable production of its popular "This Is Your Day!" weekly program, along with special televised events available to viewers, in the superior sound and picture quality of HD television.
Crystal Cathedral Ministries
The production studio for the Hour of Power is housed within the glass-sheathed Crystal Cathedral, designed by New York architect Philip Johnson. The Crystal Cathedral is the first church conceived and designed to be a television super studio for televised congregational Christian worship. offered us the most reasonable and flexible plan for making a cost-effective jump to a state-of-the-art HD production infrastructure
Technicolor Los Angeles
Project manage, install and wire new and existing customer furnished equipment for color correction facilities, editing suites and machine rooms within a compressed time frame. Multiple construction delays significantly impacted the installation phase of the project especially since the completion deadlines were immoveable.
Solution
Provide CDR (Critical Design Review), project management and labor to rack, stack and wire existing and new customer furnished equipment that required running over 18,000 wires. In addition, TV Magic assisted the client with the integration of telecine rooms. The system was installed and operational before the Temporary Certificate of Occupancy was issued.